responsibility finder
Schleswig-Holstein

Apply for the construction of a footpath crossing

Source: Zuständigkeitsfinder Schleswig-Holstein (Linie6Plus)

Service Description

If you wish to have a footpath crossing (lowered kerb) built, you must apply for a permit.

A footpath crossing is also known as a lowered kerb. It is used for easy access to your own property from the street with a vehicle.

To do this, you need permission in advance from the local civil engineering office. The civil engineering office can provide you with specific regulations on how the footpath crossing must be constructed.


Process flow
  • You apply to the responsible authority for the construction of the footpath crossing.
  • The application will be reviewed.
  • For more extensive measures, you must organize and carry out an on-site appointment in advance together with the responsible authority.
  • Once your application has been approved, you will receive a notice of approval and can have the footpath crossing built (subject to possible conditions and requirements).
Who should I contact?
  • Regional civil engineering office
  • For exceptions (e.g. cycle paths on federal highways) Landesbetrieb Straßenbau und Verkehr Schleswig-Holstein
Requirements

You are the landowner, tenant or other authorized person.

Which documents are required?
  • Application, if available
  • Any necessary attachments (e.g. cadastral plan, site plan)
What are the fees?

You bear the costs for the construction of the footpath crossing.

Administration fee: 22,00 EUR
Payment in advance: no
The fee is charged by the Schleswig-Holstein Road Construction and Transport Authority if it is responsible.

What deadlines do I have to pay attention to?

You can start work as soon as you have received permission.

Processing duration

Individually according to expenditure.

Legal basis
Appeal
  • Objection
  • Complaint
Author

The text was automatically translated based on the German content.

Teaser

If you wish to have a footpath crossing (lowered kerb) built, you must apply for a permit.

Process flow

  • You apply to the responsible authority for the construction of the footpath crossing.
  • The application will be reviewed.
  • For more extensive measures, you must organize and carry out an on-site appointment in advance together with the responsible authority.
  • Once your application has been approved, you will receive a notice of approval and can have the footpath crossing built (subject to possible conditions and requirements).

Who should I contact?

  • Regional civil engineering office
  • For exceptions (e.g. cycle paths on federal highways) Landesbetrieb Straßenbau und Verkehr Schleswig-Holstein

Requirements

You are the landowner, tenant or other authorized person.

Which documents are required?

  • Application, if available
  • Any necessary attachments (e.g. cadastral plan, site plan)

What are the fees?

You bear the costs for the construction of the footpath crossing.

Administration fee: 22,00 EUR
Payment in advance: no
The fee is charged by the Schleswig-Holstein Road Construction and Transport Authority if it is responsible.

What deadlines do I have to pay attention to?

You can start work as soon as you have received permission.

Processing duration

Individually according to expenditure.

Legal basis

Appeal

  • Objection
  • Complaint

Author

The text was automatically translated based on the German content.

Further information and offers